Set up to code?
Posted: Sun Nov 02, 2003 8:09 pm
Need some answers on the following:
1) The house I have Purchased has a raised roof. The peaks had to be made because the factory sent the wrong size. The ones made on site are nailed together but do not have the press on plates like the ones sent by the factory.
2) Some of the Strong backs (or the 2X4s holding the peak) are lose or not nailed at all. I know this or course is not correct.
3) Scraps of OSB are being used to finish off the peak (6 inches in width) because th factory sent the wrong size.
Now, I dont hold this against the set up crew, because they are dealing with what Clayton has sent them, but the job needs to be done right. Just want some opinions, I realy wish the local building inspectors would inspect the setup.
1) The house I have Purchased has a raised roof. The peaks had to be made because the factory sent the wrong size. The ones made on site are nailed together but do not have the press on plates like the ones sent by the factory.
2) Some of the Strong backs (or the 2X4s holding the peak) are lose or not nailed at all. I know this or course is not correct.
3) Scraps of OSB are being used to finish off the peak (6 inches in width) because th factory sent the wrong size.
Now, I dont hold this against the set up crew, because they are dealing with what Clayton has sent them, but the job needs to be done right. Just want some opinions, I realy wish the local building inspectors would inspect the setup.